Waiting for the Concrete to Dry: Waiting for the concrete to dry at Johnston Memorial medial building in Arlington, VA.

Most flooring materials require a dry sub-straight before they can be applied and many of the flooring manufacturers have added maximum floor moisture content for their warranties to maintained.  Contractors responsible for getting a building turned over to the owner are often finding themselves making a choice between shot basting and sealing the floors or setting up a temporary climate control system.

Product Number: 41212-708-SG
Author: David Simkins
Publication Date: 2012
$0.00
$20.00
$20.00

Most flooring materials require a dry sub-straight before they can be applied and many of the flooring manufacturers have added maximum floor moisture content for their warranties to maintained.  Contractors responsible for getting a building turned over to the owner are often finding themselves making a choice between shot basting and sealing the floors or setting up a temporary climate control system.

Most flooring materials require a dry sub-straight before they can be applied and many of the flooring manufacturers have added maximum floor moisture content for their warranties to maintained.  Contractors responsible for getting a building turned over to the owner are often finding themselves making a choice between shot basting and sealing the floors or setting up a temporary climate control system.