Search
Filters
Close

Celebrate World Corrosion Awareness Day with 20% off eCourses and eBooks with code WCAD2024 at checkout!

Review of a Refinery Boiler Tube Failure

In late 2021, several leaks were observed inside the waste heat boiler coil of the steam reformer furnace at the refinery. The leaks were located in the first row of tubes of the hot bank in the vertically-oriented coil, where boiler water inside the tubes is heated via waste heat of the reformer stack. The waste heat boiler coil has a design duty of 69.59 MMBtu/hr (~20.4 MW), with design pressures and temperatures of 1010 psig (6.9 MPa) and 700°F (371°C), respectively.

Product Number: 51323-19067-SG
Author: Darrell Freeman, Ryan Horsley, David Whitt, Mel J. Esmacher
Publication Date: 2023
$0.00
$20.00
$20.00

Each boiler design presents its own challenges to ensure reliable operation, and some are more sensitive than others. A failure occurred in the finned, carbon steel tubing in the Waste Heat Boiler Coil at a large North American oil refinery. After witnessing several visible steam leaks in the hot bank, the coil was shut down. Testing identified 29 leaking tubes. Subsequent non-destructive testing indicated up to 58% wall loss in the cold bank tubes. This paper reviews the conditions leading up to those failures in the hot bank and identifies the primary causes and contributing factors, including coil design aspects, operational practices and others. Remedial measures taken to circumvent design issues and best practices implemented will be discussed that can benefit boiler operators in preventing costly downtime and safety hazards from boiler tube failures.

Each boiler design presents its own challenges to ensure reliable operation, and some are more sensitive than others. A failure occurred in the finned, carbon steel tubing in the Waste Heat Boiler Coil at a large North American oil refinery. After witnessing several visible steam leaks in the hot bank, the coil was shut down. Testing identified 29 leaking tubes. Subsequent non-destructive testing indicated up to 58% wall loss in the cold bank tubes. This paper reviews the conditions leading up to those failures in the hot bank and identifies the primary causes and contributing factors, including coil design aspects, operational practices and others. Remedial measures taken to circumvent design issues and best practices implemented will be discussed that can benefit boiler operators in preventing costly downtime and safety hazards from boiler tube failures.

Also Purchased
Picture for 07451 Caustic Gouging in a Refinery Boiler - Root Cause and Remediation
Available for download

07451 Caustic Gouging in a Refinery Boiler - Root Cause and Remediation

Product Number: 51300-07451-SG
ISBN: 07451 2007 CP
Author: Stephen P. Wood, William J. Algeo, Robert A. Call, and Thomas M. Laronge
Publication Date: 2007
$20.00
Picture for 07455 Case Studies of Waste Heat Boiler Failure in Refineries
Available for download

07455 Case Studies of Waste Heat Boiler Failure in Refineries

Product Number: 51300-07455-SG
ISBN: 07455 2007 CP
Author: Hongwei Wang, Deyuan Fan, and William R. Coyle
Publication Date: 2007
$20.00