Celebrate World Corrosion Awareness Day with 20% off eCourses and eBooks with code WCAD2024 at checkout!
In late 2021, several leaks were observed inside the waste heat boiler coil of the steam reformer furnace at the refinery. The leaks were located in the first row of tubes of the hot bank in the vertically-oriented coil, where boiler water inside the tubes is heated via waste heat of the reformer stack. The waste heat boiler coil has a design duty of 69.59 MMBtu/hr (~20.4 MW), with design pressures and temperatures of 1010 psig (6.9 MPa) and 700°F (371°C), respectively.
Each boiler design presents its own challenges to ensure reliable operation, and some are more sensitive than others. A failure occurred in the finned, carbon steel tubing in the Waste Heat Boiler Coil at a large North American oil refinery. After witnessing several visible steam leaks in the hot bank, the coil was shut down. Testing identified 29 leaking tubes. Subsequent non-destructive testing indicated up to 58% wall loss in the cold bank tubes. This paper reviews the conditions leading up to those failures in the hot bank and identifies the primary causes and contributing factors, including coil design aspects, operational practices and others. Remedial measures taken to circumvent design issues and best practices implemented will be discussed that can benefit boiler operators in preventing costly downtime and safety hazards from boiler tube failures.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Use this error code for reference:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
Failure analysis methodology is applied to the principal mechanisms by which boiler tubes fail during service. sThe failure analysis procedure, or methodology for evaluation, is provided in a step by step approach. Among the case histories discussed are: fatigue, erosion, short-term overheating, and hydrogen damage.