Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

The Contractor’s Logistics and Challenges of Painting Commercial Stores During Operation

The logistics of painting commercial buildings can be focused into four categories: Pre-inspection of the building, communication, planning, scheduling and implementation. The challenges of painting commercial stores during operation include, but are not limited to, pre-existing building conditions, management cooperation, weather conditions, store schedule, customer accessibility to merchandise, and protecting store merchandise and customer property from overspray or equipment damage.

Product Number: 41211-621-SG
Author: Dennis Kitterman
Publication Date: 2011
Industry: Coatings
$0.00
$20.00
$20.00

The logistics of painting commercial buildings can be focused into four categories: Pre-inspection of the building, communication, planning, scheduling and implementation. The challenges of painting commercial stores during operation include, but are not limited to, pre-existing building conditions, management cooperation, weather conditions, store schedule, customer accessibility to merchandise, and protecting store merchandise and customer property from overspray or equipment damage.

The logistics of painting commercial buildings can be focused into four categories: Pre-inspection of the building, communication, planning, scheduling and implementation. The challenges of painting commercial stores during operation include, but are not limited to, pre-existing building conditions, management cooperation, weather conditions, store schedule, customer accessibility to merchandise, and protecting store merchandise and customer property from overspray or equipment damage.

Product tags
Also Purchased
Picture for 11354 Monitoring the Corrosion of Copper-Nickel-Chromium Castings
Available for download

Monitoring the Corrosion of Copper-Nickel-Chromium Castings Using Electrochemical Frequency Modulation

Product Number: 51300-11354-SG
Author: Derek R. Lenard, Yueping Wang and Bradley A. Noren
Publication Date: 2011
$20.00
Picture for 11296 Environmentally Assisted Cracking Evaluation of UNS N06686
Available for download

Environmentally Assisted Cracking Evaluation of UNS N06686 Using Constant Extension Rate Testing

Product Number: 51300-11296-SG
ISBN: 2011 11296 CP
Author: Michelle G. Koul and Peggy S. LeGrand
Publication Date: 2011
$20.00
Picture for 11129 Integration of External Corrosion Direct Assessment
Available for download

Integration of External Corrosion Direct Assessment with Integrity Management Software Application

Product Number: 51300-11129-SG
ISBN: 2011 11129 CP
Author: Lyle Welsh
Publication Date: 2011
$20.00