Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

NACE SP0116-2016, Multiphase Flow Internal Corrosion Direct Assessment (MP-ICDA) Methodology for Pipelines

HISTORICAL DOCUMENT. Methodology for applying the  internal corrosion direct assessment (ICDA) process for multiphase flow onshore and offshore pipeline  systems.

Product Number: 21402-SG
Publication Date: 2016
$179.00
$179.00
$179.00

HISTORICAL DOCUMENT. This standard describes the NACE International internal corrosion direct assessment (ICDA) process for multiphase flow pipeline systems. Intended to serve as a guide for applying the MP-ICDA process to these types of pipeline systems, this standard outlines a methodology to assess pipeline integrity because of the threat of internal corrosion. This standard applies to both onshore and offshore pipelines containing CO2, H2S, and O2. Included in this standard are several figures detailing the steps in the MP-ICDA assessment process and tables containing data and selection criteria. There are also three appendices for additional information. 

Keywords: Multiphase flow, internal corrosion direct assessment, MP-ICDA, pipeline integrity, flow modeling, corrosion rate prediction modeling

 

HISTORICAL DOCUMENT. This standard describes the NACE International internal corrosion direct assessment (ICDA) process for multiphase flow pipeline systems. Intended to serve as a guide for applying the MP-ICDA process to these types of pipeline systems, this standard outlines a methodology to assess pipeline integrity because of the threat of internal corrosion. This standard applies to both onshore and offshore pipelines containing CO2, H2S, and O2. Included in this standard are several figures detailing the steps in the MP-ICDA assessment process and tables containing data and selection criteria. There are also three appendices for additional information. 

Keywords: Multiphase flow, internal corrosion direct assessment, MP-ICDA, pipeline integrity, flow modeling, corrosion rate prediction modeling

 

Also Purchased