Save 20% on select titles with code HIDDEN24 - Shop The Sale Now
Those who started in the industrial painting industry back in the 1980s may remember that third-party inspectors, hired by the owner, performed all of the inspection activities and documentation. The NACE Coating Inspection Program (CIP) had just begun in the early 80s, but those getting certified did not work for a contractor. That has changed. Now contractor quality control (QC) and owner quality assurance (QA) are much more clearly defined.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Error Message:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
This paper presents case histories on two commercial projects that incorporated industrial surface preparation, application and quality control standards and procedures into the work plans to achieve successful results. Highlights of SSPC audits for QP-8 and QP-9 recertification on the projects will also be discussed.
Critical procedures at blasting and coating shops and steel fabricating shops, include surface preparation, application of primer coats, often shop applications include intermediate coat application, as well as occasionally including topcoat application. These phases of the process are absolutely critical to the long-term success of coating/lining projects. If the industry is serious about quality, specifiers must include language in the project specifications to include mandatory independent qualified coating inspection during shop coating applications.
Successful repair material and coating applications are dependent on proper concrete surface preparation. Different surface preparation technologies and quality control methods are reviewed to increase the successful application of materials applied to existing concrete surfaces.
Successful repair material and coating applications are dependent on proper concrete surface preparation where different technologies and methods must be reviewed and characterized, as well as quality control methods used to increase the successful application of materials applied to existing concrete surfaces.
This presentation will define what a containment / work platform is for the removal of lead paint for steel structures. Additional topics of discussion will include the design process for containment systems, submission requirements/reviews, containment system installation, and quality control procedures and component review and acceptance in the field by Engineers and Inspectors.
Significant quality control/quality assurance data is collected during industrial coating projects. Too often this data is surveyed for compliance with the contract requirements and then relegated to a file cabinet, never to be seen again. The paper highlights the types of coating inspection data collected and various “value-added” analyses which may be performed.
This paper explores the process of repairing and preparing concrete substrates for application of protective sealers, coatings, or linings. It will present the road map, provided in SSPC SP 13 / NACE 6, “Surface Preparation of Concrete” to attain long term barrier protection performance. It will present the means and methods to achieve a concrete surface suitable for sealer, coating, or lining application.
Statistical Process Control (SPC) has been implemented as a key component of Total Quality Initiatives with great success in every major industry worldwide. SPC is not commonplace in the industrial and commercial coatings application business. This paper introduces the audience to SPC and provides an example of it’s application in industrial coating surface preparation.
This standard addresses initial inspection of the tubular goods and accessories prior to coating, surface preparation, coatingapplication,coatinginspection,coupling/connectionmake-up,qualitycontrol,handling,storage,shipping,and marking.
This paper utilizes the painting, of the Vincent Thomas Bridge’s, east tower to highlight QC issues encountered during a spot prime, full overcoat paint project.
The selection of a coating for suitable use on the exterior of a pipeline is an important consideration due to the safety and cost consequences of potential corrosion. Because there are numerous fusion bonded epoxy (FBE) mainline and field joint coating systems available, the selection of the optimum coating system is as much an art as a science.