Life Extension of Offshore Field in The Santa Barbara Channel 2: Multi-Objective Optimization of Retrofit ICCP Anode Sled Placement Using Calibrated 3D Simulations

The life of offshore jacket structures can be extended up to 30 years towards the end of their design life by retrofits. For larger structures, and in unusual cases, semi-remote ICCP anode sleds are a favorable option compared to sacrificial anode cathodic protection (SACP) due to the high current output from each individual installation, reducing the time to install substantially. Anode sled locations are determined based on site plans, experience, survey data, and equations evaluating “remoteness” or “voltage rise” criteria.

Product Number: 51323-19382-SG
Author: Matthew L. Taylor, Omar Rosas Camacho, Sami Abu-Zahra
Publication Date: 2023
$0.00
$20.00
$20.00

Three structures and seven pipelines at Santa Ynez Unit (SYU) in the Santa Barbara Channel require cathodic protection (CP) life extension. The primary post-retrofit corrosion risks are expected to be overpolarization of the pipelines and underpolarization of the jacket interiors. Due to high current requirements and installation limitations, retrofit Impressed Current Cathodic Protection (ICCP) systems comprising high output remote anode sleds were specified. The polarization risk associated with remote ICCP systems is affected by sled position, especially when high current output sleds are used. Cable length is also controlled by sled placement and represents substantial project cost.


Given the complexity of SYU, historical methodologies such as “voltage rise” and “remoteness” criteria are insufficient tools for quantifying polarization risk. Polarization risk was instead defined with a 3D model that accounted for anode mutual interference and interactions between structures and pipelines. Model parameters were calibrated with CP survey measurements and historical environmental data.


The model was evaluated many times in a multi-objective optimization of anode sled placement to simultaneously reduce polarization risk and cable cost.


A tradeoff curve comparing system cost and polarization risk was constructed from which stakeholders and subject matter experts made an informed decision on the final configuration.

Three structures and seven pipelines at Santa Ynez Unit (SYU) in the Santa Barbara Channel require cathodic protection (CP) life extension. The primary post-retrofit corrosion risks are expected to be overpolarization of the pipelines and underpolarization of the jacket interiors. Due to high current requirements and installation limitations, retrofit Impressed Current Cathodic Protection (ICCP) systems comprising high output remote anode sleds were specified. The polarization risk associated with remote ICCP systems is affected by sled position, especially when high current output sleds are used. Cable length is also controlled by sled placement and represents substantial project cost.


Given the complexity of SYU, historical methodologies such as “voltage rise” and “remoteness” criteria are insufficient tools for quantifying polarization risk. Polarization risk was instead defined with a 3D model that accounted for anode mutual interference and interactions between structures and pipelines. Model parameters were calibrated with CP survey measurements and historical environmental data.


The model was evaluated many times in a multi-objective optimization of anode sled placement to simultaneously reduce polarization risk and cable cost.


A tradeoff curve comparing system cost and polarization risk was constructed from which stakeholders and subject matter experts made an informed decision on the final configuration.

Also Purchased
Picture for 03163 Risk Assessments as Part of Pipeline
Available for download

03163 Risk Assessments as Part of Pipeline Integrity Determination For Subsea Oil & Gas Pipelines

Product Number: 51300-03163-SG
ISBN: 03163 2003 CP
Author: Gareth John, Pat Stokes, Pat Mclntosh
$20.00
Picture for 02251 SEVEN YEARS EXPERIENCE FROM SUBSEA,...
Available for download

02251 SEVEN YEARS EXPERIENCE FROM SUBSEA, DEEPWATER PIPELINE INTERNAL CORROSION MONITORING

Product Number: 51300-02251-SG
ISBN: 02251 2002 CP
Author: Roe D. Strommen
$20.00