Search
Filters
Close

Save 20% on select titles with code HIDDEN24 - Shop The Sale Now

Blasting at Long Distance. Corrosion Maintenance on the Sydney Harbour Bridge: a 30 Year Case Study

The aim of this case study is to identify the challenges of blasting a large bridge, blasting at long distances from equipment, and painting on a maintenance program vs the whole bridge. Then we provide recommendations and suggestions how to make it profitable, based on real-life project experience.

Product Number: 51220-245-SG
Author: Charlie Gooden
Publication Date: 2020
Industry: Coatings
$0.00
$20.00
$20.00

The aim of this case study is to identify the challenges of blasting a large bridge, blasting at long distances from equipment, and painting on a maintenance program vs the whole bridge. Then we provide recommendations and suggestions how to make it profitable, based on real-life project experience.

The aim of this case study is to identify the challenges of blasting a large bridge, blasting at long distances from equipment, and painting on a maintenance program vs the whole bridge. Then we provide recommendations and suggestions how to make it profitable, based on real-life project experience.

Also Purchased