This case history discusses the integrated stray current mitigation and corrosion control design and start-up for a 20-mile long high pressure natural gas pipeline. The pipeline route parallels several high voltage overhead AC power lines. It is also in an area of heavy stray direct current (DC) influence from a network of DC powered rail transit lines. The paper highlights the corrosion control design construction and operational challenges associated with a regulated pipeline through a congested urban area.