Search
Filters
Close

Save 20% on select titles with code HIDDEN24 - Shop The Sale Now

07177 Interference and Influence Solutions for Planning Close Interval Survey

Product Number: 51300-07177-SG
ISBN: 07177 2007 CP
Author: Clayton L. Martin and Paul J. Sedlet
Publication Date: 2007
$0.00
$20.00
$20.00
Corporations spend millions of dollars annually performing close interval potential surveys (CIS) on pipeline systems. Without research or knowledge of all influencing impressed current cathodic protection sources prior to conducting the surveys, much of the data collected may be inaccurate, incomplete and invalid. This paper does not introduce new concepts in influence testing, but instead introduces new survey techniques that improve our ability as corrosion control professionals to evaluate influence from impressed current cathodic protection sources when planning surveys. The information collected during the influence study is used to develop an optimal interruption plan prior to conducting a CIS. These tools improve data quality, speed up the survey process and reduce costs. In addition, data obtained from these studies provides many benefits which are useful for data interpretation during routine annual surveys.
Corporations spend millions of dollars annually performing close interval potential surveys (CIS) on pipeline systems. Without research or knowledge of all influencing impressed current cathodic protection sources prior to conducting the surveys, much of the data collected may be inaccurate, incomplete and invalid. This paper does not introduce new concepts in influence testing, but instead introduces new survey techniques that improve our ability as corrosion control professionals to evaluate influence from impressed current cathodic protection sources when planning surveys. The information collected during the influence study is used to develop an optimal interruption plan prior to conducting a CIS. These tools improve data quality, speed up the survey process and reduce costs. In addition, data obtained from these studies provides many benefits which are useful for data interpretation during routine annual surveys.
Product tags
Also Purchased
Picture for 09124 Potential Errors in Close-Interval Surveys at Pipeline Crossings
Available for download

09124 Potential Errors in Close-Interval Surveys at Pipeline Crossings

Product Number: 51300-09124-SG
ISBN: 09124 2009 CP
Author: Robin Leigh Pawsonb
Publication Date: 2009
$20.00
Picture for 09126 Preparing for Close-Interval Survey
Available for download

09126 Preparing for Close-Interval Survey

Product Number: 51300-09126-SG
ISBN: 09126 2009 CP
Author: Drew Hevle
Publication Date: 2009
$20.00
Picture for 97575 CLOSE INTERVAL POTENTIAL SURVEYS
Available for download

97575 CLOSE INTERVAL POTENTIAL SURVEYS PLANNING, EXECUTION, RESULTS

Product Number: 51300-97575-SG
ISBN: 97575 1997 CP
Author: R.L.Pawson
$20.00