Search
Filters
Close

51312-01347-Would the Real -850mVcse Potential Criterion Please Stand Up

Product Number: 51312-01347-SG
ISBN: 01347 2012 CP
Author: R. A. Gummow
Publication Date: 2012
$0.00
$20.00
$20.00
Some recent NACE papers addressing the two -850mVcse criteria in NACE SP0168-2007 have contained errors in describing the background of the criteria which perpetuates the confusion that is endemic in the cathodic protection industry. This paper traces the empirical roots which affected the development of these -850mVcse criteria. The historical record covers the work of R.J.Khun Shwerdtfeger and McDorman at the National Bureau of Standards AGA laboratory and field studies conducted by Barlo and Berry and a number of European investigators. Review of this body of work clarifies the interpretation of the of the -850mVcse criterion which should result in resolving the mistaken impression that there are two distinct criteria. Fundamental analysis of these criteria in conjunction with rigorous interpretation of the pipe-to-soil potential measurement supports the conclusion that the two criteria are essentially equivalent. Convincing certain sectors of the pipeline industry of this conclusion remains a considerable challenge.
Some recent NACE papers addressing the two -850mVcse criteria in NACE SP0168-2007 have contained errors in describing the background of the criteria which perpetuates the confusion that is endemic in the cathodic protection industry. This paper traces the empirical roots which affected the development of these -850mVcse criteria. The historical record covers the work of R.J.Khun Shwerdtfeger and McDorman at the National Bureau of Standards AGA laboratory and field studies conducted by Barlo and Berry and a number of European investigators. Review of this body of work clarifies the interpretation of the of the -850mVcse criterion which should result in resolving the mistaken impression that there are two distinct criteria. Fundamental analysis of these criteria in conjunction with rigorous interpretation of the pipe-to-soil potential measurement supports the conclusion that the two criteria are essentially equivalent. Convincing certain sectors of the pipeline industry of this conclusion remains a considerable challenge.
Product tags
Also Purchased
Picture for An Alternative View of the Cathodic Protection Mechanism on Buried Pipelines
Available for download

51316-7531-An Alternative View of the Cathodic Protection Mechanism on Buried Pipelines

Product Number: 51316-7531-SG
ISBN: 7531 2016 CP
Author: Robert Gummow
Publication Date: 2016
$20.00
Picture for Using Local Electrochemical Impedance Spectroscopy to Detect Coating Defects on Buried Pipelines
Available for download

51312-01332-Using Local Electrochemical Impedance Spectroscopy to Detect Coating Defects on Buried Pipelines

Product Number: 51312-01332-SG
ISBN: 01332 2012 CP
Author: Pavan K. Shukla
Publication Date: 2012
$20.00
Picture for 01581 ORIGIN AND VALIDATION OF THE 100 mV
Available for download

01581 ORIGIN AND VALIDATION OF THE 100 mV POLARIZATION CRITERION

Product Number: 51300-01581-SG
ISBN: 01581 2001 CP
Author: Thomas J. Barlo
$20.00