Save 20% on select titles with code HIDDEN24 - Shop The Sale Now
The paper discusses “past” developments, “present” status, and “future” advancements of inspection, monitoring, and modelling technologies.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Error Message:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
Indirect assessment techniques (special over-the-line potential and soil corrosivity surveys) were applied on an electrically discontinuous effluent sewer land outfall. Critical areas were excavated and direct assessment performed. Mitigation methods were recommended.
Pipelines have been considered one of the safest methods of transporting energy from one place to another. This is achieved through a systematically planned, documented, and comprehensive pipeline integrity management (PIM) program. PIM covers areas such as engineering, operations, inspections and maintenance, health and safety, and environment protection.
The paper will cover the construction method (based on Random forest algorithms), the first results. We will see the enhancements of the model by injecting more data and modifying mathematical rule, and how it will be able to integrate a new decision support tool.
The External Corrosion Direct Assessment (ECDA) is formally listed as an acceptable integrity assessment method within Subpart O, Part 192 of the code of federal regulations regarding gas transmission pipeline integrity management2. It is a 4 step continuous improvement process to identify and address locations where external corrosion activity has occurred, is occurring or may occur1. In the pre-assessment phase, a comprehensive right-of-way inspection is performed, and pipeline operability data is collected to verify the feasibility of conducting a full ECDA for the pipeline under evaluation. In the indirect inspection phase, the status of cathodic protection and pipeline coating is tested using methods such as Close Interval Potential Surveys (CIPS) and Direct Current Voltage Gradient (DCVG) surveys.
Pipelines are laid in the harshest of environments. From enduring extreme heat in sandy environments to sub-zero temperatures near the Arctic Circle, pipelines have primarily two layers of defence – Coating and Cathodic Protection (CP), for managing the external integrity.
Majority of the traditional aboveground CP and Coating survey techniques being utilized in the industry are offered with several hurdles – the most important being the authenticity of the datasets being collected.
Managing Stress Corrosion Cracking (SCC) by direct assessment. Selecting, inspecting and analyzing data. Mitigation, reevaluation and evaluation.
Asociación Nacional de Ingenieros de Corrosión. (NACE). Evaluación confirmatoria directo de corrosión externa (ECCDA) para tuberías ferrosas enterradas.