Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

Metallurgical Analysis of Hydrotested 20-Inch Natural Gas Pipeline

Product Number: 51321-16330-SG
Author: Sudhakar Mahajanam/Efrain Garcia/Ken Riggs
Publication Date: 2021
$0.00
$20.00
$20.00

Hydrostatic testing of pipelines is critical during construction and maintenance. It is an important pre-commission test and destructive tool which validates the integrity of the pipeline prior to actual service with flammable fluids at high pressures. Hydrotesting provides the quality control needed to ensure that the required pipeline tensile strength is available to sustain the operating pressure, and that the welds and joints are defect free. In this paper, we discuss a recent case study wherein metallurgical analysis was performed at our lab on a 20-inch API 5L X65 carbon steel pipeline. A leak was detected during the commissioning hydrotest of a newly constructed pipeline in the field at a client site. Dye penetrant testing, x-ray radiography and phased array UT inspection techniques revealed the presence of a defect at the electric resistance weld (ERW) seam. Based on the analyses, it was confirmed that the defect was due to incomplete fusion at the long seam weld during the ERW welding process.

Key words: Metallurgical analysis, hydrostatic testing, pipeline welding defects, lack of fusion, ERW weld.

Hydrostatic testing of pipelines is critical during construction and maintenance. It is an important pre-commission test and destructive tool which validates the integrity of the pipeline prior to actual service with flammable fluids at high pressures. Hydrotesting provides the quality control needed to ensure that the required pipeline tensile strength is available to sustain the operating pressure, and that the welds and joints are defect free. In this paper, we discuss a recent case study wherein metallurgical analysis was performed at our lab on a 20-inch API 5L X65 carbon steel pipeline. A leak was detected during the commissioning hydrotest of a newly constructed pipeline in the field at a client site. Dye penetrant testing, x-ray radiography and phased array UT inspection techniques revealed the presence of a defect at the electric resistance weld (ERW) seam. Based on the analyses, it was confirmed that the defect was due to incomplete fusion at the long seam weld during the ERW welding process.

Key words: Metallurgical analysis, hydrostatic testing, pipeline welding defects, lack of fusion, ERW weld.

Also Purchased
Picture for 03572 CHEMICAL TREATMENT OPTIONS FOR HYDROTEST
Available for download

03572 CHEMICAL TREATMENT OPTIONS FOR HYDROTEST

Product Number: 51300-03572-SG
ISBN: 03572 2003 CP
Publication Date: 2003
$20.00
Picture for 03569 MICROBIOLOGICALLY INDUCED CORROSION
Available for download

03569 MICROBIOLOGICALLY INDUCED CORROSION OF COPPER PIPING SYSTEM - FAILURE ANALYSIS

Product Number: 51300-03569-SG
ISBN: 03569 2003 CP
Author: E. M. Labuda
$20.00