Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.
During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.
Use GIVING24 at checkout to save 20% on eCourses and books (some exclusions apply)!
The Florida Department of Transportation (FDOT) undertook recoating of the superstructure steel components of the SR 292 high-level bridge over the Intracoastal Water Way (ICWW) in Perdido Key, Florida, which carries one lane of traffic in each direction and is the only connection between Perdido Key and the mainland. Due to the significant impact to businesses and the public, including tourists, from any proposed lane closures, FDOT looked for other means to address the deteriorating paint system, provide for a longer service life, and complete the work without any lane closures on the bridge.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Error Message:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
This paper discusses how to determine the “safe” separation distance that is required for transmission powerline tower and an adjacent pipeline to avoid an arc from the former to the latter - based on research literature and standards. Mitigation.
A preliminary research to identify the possible susceptibility of a case study marine bridge infrastructure to MIC is the main objective. This will be supported by determining the bacteria, nutrient levels, environmental conditions and other factors that could support MIC.