This paper presents the results of an investigation that included the excavation and analysis of six (6) coupons test stations exposed to changing levels of induced AC interference from adjacent HVAC transmission lines. The coupon test stations were installed on a liquid product pipeline. The locations were selected based on AC interference historical records and accessibility. The coupon excavation and removal procedures were performed in a manner that allowed the soil near the coupons to be observed intact and separated from the surrounding backfill. The coupon conditions were photographed and documented upon excavation, prior to cleaning and after all deposits and corrosion products were removed. The maximum pit depth, diameter reduction and morphology all were documented and compared to the AC interference history (A/m2 levels and time of exposure). Notable findings include that all the examined CP coupons showed some AC assisted corrosion damage. In some cases, this damage was severe even with a high level of cathodic protection. The field testing and laboratory analysis showed that the CP current collecting on the bonded coupon caused significant changes in the chemistry in the adjacent soil compared to the nearby backfill.
Key words: liquid product pipeline, induced AC interference, soil chemistry, AC assisted corrosion damage
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Use this error code for reference:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
Challenges associated with coordinating the modelling, design, and installation of an alternating current interference and mitigation systems. The project consisted of a 65 kilometer long double circuit 500 kilovolt (kV) overhead transmission in a heavily congested right-of-way corridor with more than 80 pipelines.
An AC interference study was conducted in 2015 after the installation of a 240 kV powerline. Risk of AC corrosion was indicated. Describe are both the challenges and the solutions, including the design of a temporary mitigation system allowing energization of the powerline at reduced power.