Search
Filters
Close

Save 20% on select titles with code HIDDEN24 - Shop The Sale Now

Coatings Failures: Analysis and Solutions--Infrastructure

This is a print-on-demand (POD) book that will be produced just for you in 2-5 days after your order. It should arrive at your door in about one to two weeks. However, due to supply chain and logistic challenges currently affecting the industry, it may take longer. Allow three weeks for international orders.

In this multi-author book, Coatings Failures: Case Studies in Analysis and Solutions-Infrastructure, coatings experts recall days in the field when they were faced with a problem, such as premature coating failures, determined a cause, and developed a solution.  

The six chapters include case studies on topics such as how alkyd paints should never be used on steel that is intended for immersion service; how important it is to remember buildings such as coal-fired power plants have many different types of piping, structures, and other areas that operate at different temperatures, with many different functions; how when evaluating peeling paint on structures such as pedestrian bridges, it is always a good idea to do some adhesion testing in areas that appear to be non-failing; and more. 

2022 AMPP, 6 x 9 trim size, softbound

Product Number: 37671-POD
ISBN: 978-1-57590-420-7
$41.25
$55.00
$55.00

This is a print-on-demand (POD) book that will be produced just for you in 2-5 days after your order. It should arrive at your door in about one to two weeks. However, due to supply chain and logistic challenges currently affecting the industry, it may take longer. Allow three weeks for international orders.

In this multi-author book, Coatings Failures: Case Studies in Analysis and Solutions-Infrastructure, coatings experts recall days in the field when they were faced with a problem, such as premature coating failures, determined a cause, and developed a solution.

Throughout the book, the subject-matter experts share insights such as the most often underestimated aspect of an engineering project: the amount of time required to adequately protect unpainted surfaces from damage during surface prep and coating applications. 

The six chapters include case studies on topics such as how alkyd paints should never be used on steel that is intended for immersion service; how important it is to remember buildings such as coal-fired power plants have many different types of piping, structures, and other areas that operate at different temperatures, with many different functions; how when evaluating peeling paint on structures such as pedestrian bridges, it is always a good idea to do some adhesion testing in areas that appear to be non-failing; and more. 

2022 AMPP, 6 x 9 trim size, softbound

This is a print-on-demand (POD) book that will be produced just for you in 2-5 days after your order. It should arrive at your door in about one to two weeks. However, due to supply chain and logistic challenges currently affecting the industry, it may take longer. Allow three weeks for international orders.

In this multi-author book, Coatings Failures: Case Studies in Analysis and Solutions-Infrastructure, coatings experts recall days in the field when they were faced with a problem, such as premature coating failures, determined a cause, and developed a solution.

Throughout the book, the subject-matter experts share insights such as the most often underestimated aspect of an engineering project: the amount of time required to adequately protect unpainted surfaces from damage during surface prep and coating applications. 

The six chapters include case studies on topics such as how alkyd paints should never be used on steel that is intended for immersion service; how important it is to remember buildings such as coal-fired power plants have many different types of piping, structures, and other areas that operate at different temperatures, with many different functions; how when evaluating peeling paint on structures such as pedestrian bridges, it is always a good idea to do some adhesion testing in areas that appear to be non-failing; and more. 

2022 AMPP, 6 x 9 trim size, softbound

Also Purchased