Celebrate World Corrosion Awareness Day with 20% off eCourses and eBooks with code WCAD2024 at checkout!
This case study involves an NPS 36, 107 km long pipeline (Pipeline A) installed in 2016. The subject pipeline is collocated with an NPS 30 pipeline constructed in 1999 (Pipeline B), for the entire route, and two additional pipelines near the start of its route (Pipelines C and D), all owned by the same operator.
An initial AC interference study and mitigation design was performed prior to construction, on the subject NPS 36, 107 km long pipeline (Pipeline A) installed in 2016. The subject pipeline is collocated with an NPS 30 pipeline (Pipeline B) constructed in 1999, for the entire route, and several other pipelines in some areas, all owned by the same operator and with shared cathodic protection systems. Five areas of powerline collocation were identified and modeled in the AC Interference study.
EN Engineering (ENE) completed an AC interference study over 68 miles of an operator’s transmission line. In addition, an ACVG survey of approximately one (1) mile of the pipeline was conducted at the take-off point of the 8” line. As a result of this AC interference study, evidence of elevated AC corrosion risk has not been found on the operator’s pipeline. However, a review of the provided data shows evidence of DC interference due to a nearby foreign rectifier groundbed at the take-off point of the operator’s line.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Use this error code for reference:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
AC interference analysis between high voltage AC (HVAC) powerlines and buried pipelines is a matter of current interest due to the growing number of right-of-ways shared between powerline and pipeline infrastructure. This is only expected to increase as the worldwide energy demand grows considerably over the next 30 years,1 and stricter environmental regulations and policies are applied. Therefore, AC interference will continue to be an issue of concern for powerline and pipeline operators to protect the public, environment, and maintain asset integrity.
A substation is a place where the power system converts voltage and current and receives and distributes electric energy. When a phase line is abnormally connected to another phase line or ground, a large amount of current will flow into the ground through the grounding bed of the substation. In such case, if metal structures exist such as buried pipelines near the substation, the pipelines often withstand serious electrical interference 1, which causes stray current corrosion of the pipelines 2 and other safety problems.