Search
Filters
Close

97539 THE SIGNIFICANCE OF THE $2.3 MILLION OSHA ADJUDICATED FINE FOR PAINTING AT THE TARENTUM BRIDGE TO OTHER PAINTING PROJECTS

Product Number: 51300-97539-SG
ISBN: 97539 1997 CP
Author: J. V. Cignatta
$0.00
$20.00
$20.00
The first major case involving a multi-million dollar fme from OSHA enforcement of the new Lead In Construction Standard (29 CFR 1926.62) at the Tarentum Bridge painting project has made numerous headlines in trade journals. Now the significance of the judge’s decision is starting to become understood as its ramifications are affecting Owners, Engineers and Contractors alike. This paper reviews details of the case, evidence provided by both sides, and its ongoing impact upon industrial painting projects across the country.
The first major case involving a multi-million dollar fme from OSHA enforcement of the new Lead In Construction Standard (29 CFR 1926.62) at the Tarentum Bridge painting project has made numerous headlines in trade journals. Now the significance of the judge’s decision is starting to become understood as its ramifications are affecting Owners, Engineers and Contractors alike. This paper reviews details of the case, evidence provided by both sides, and its ongoing impact upon industrial painting projects across the country.
PRICE BREAKS - The more you buy, the more you save
Quantity
1+
5+
Price
$20.00
$20.00
Product tags
Also Purchased
Picture for 00606 INSPECTION OF WATER-BORNE INDUSTRIAL
Available for download

00606 INSPECTION OF WATER-BORNE INDUSTRIAL AND MARINE COATINGS - CAUSES AND EFFECTS EVERY INSPECTOR SHOULD KNOW

Product Number: 51300-00606-SG
ISBN: 00606 2000 CP
Author: Kenneth B. Tator and Rick A. Huntley
$20.00
Picture for 00449 THE LULING BRIDGE: AN INSIDE STORY
Available for download

00449 THE LULING BRIDGE: AN INSIDE STORY

Product Number: 51300-00449-SG
ISBN: 00449 2000 CP
Author: Desmond C. Cook and Ann C. Van Orden
$20.00