Search
Filters
Close

51318-11560- Calculation of Inspection Intervals for an Ammonia Storage Tank Based on Design Modifications, RBI, Commissioning Inspection, and FEA

A method of determining a required inspection interval for large storage tanks - with design modicfication, risk based inspection (RBI) and utilizing finite element analysis (FEA)  - with particular attention for the weld between the bottom annular plates and shell wall.

 

Product Number: 51318-11560-SG
Author: TJ Prewitt / Juan Carlos Ruiz-Rico / Shane Finneran
Publication Date: 2018
$0.00
$20.00
$20.00

One of the most critical welds in the design of a large storage tank is the weld between the bottom annular plates and shell wall. The change in direction introduces a biaxial stress, and possible stress concentration. This paper evaluates a method of determining a required inspection interval based on using a combination of conservative design modifications, risk based inspection (RBI) assessments, on site construction verification, and FEA analyses. In the case study presented, a design modification was made to specify this traditionally dual fillet weld as a full-penetration fillet weld. While this exceeds the typical design requirements, exceeding the minimum requirements, inspection codes do not provide acceptance criteria for the design. A more thorough volumetric inspection was conducted, in addition to the typical magnetic particle inspection, to confirm the full penetration of the weld was achieved. In making conservative changes to the design, more robust inspections, and performing RBI methodology, a longer inspection interval can be determined due to the increased information available on the outset. These small changes at the start of the construction can lead to increased operating time without an intrusive inspection through the lifespan of the tank.

Key words: RBI, FEA, ammonia storage tank, inspection interval, commissioning inspection, commissioning verification

One of the most critical welds in the design of a large storage tank is the weld between the bottom annular plates and shell wall. The change in direction introduces a biaxial stress, and possible stress concentration. This paper evaluates a method of determining a required inspection interval based on using a combination of conservative design modifications, risk based inspection (RBI) assessments, on site construction verification, and FEA analyses. In the case study presented, a design modification was made to specify this traditionally dual fillet weld as a full-penetration fillet weld. While this exceeds the typical design requirements, exceeding the minimum requirements, inspection codes do not provide acceptance criteria for the design. A more thorough volumetric inspection was conducted, in addition to the typical magnetic particle inspection, to confirm the full penetration of the weld was achieved. In making conservative changes to the design, more robust inspections, and performing RBI methodology, a longer inspection interval can be determined due to the increased information available on the outset. These small changes at the start of the construction can lead to increased operating time without an intrusive inspection through the lifespan of the tank.

Key words: RBI, FEA, ammonia storage tank, inspection interval, commissioning inspection, commissioning verification

Product tags
Also Purchased
Picture for Tank RBI—Pitfalls and Opportunities
Available for download

51313-02744-Tank RBI—Pitfalls and Opportunities

Product Number: 51313-02744-SG
ISBN: 02744 2013 CP
Author: Mauricio Olivares
Publication Date: 2013
$20.00
Picture for Automated UT for Underground Tank Evaluations Informs RBI Plans for Underground Diesel Storage Tank
Available for download

51314-4410-Automated UT for Underground Tank Evaluations Informs RBI Plans for Underground Diesel Storage Tank

Product Number: 51314-4410-SG
ISBN: 4410 2014 CP
Author: Graig Cilluffo
Publication Date: 2014
$20.00