Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

Use GIVING24 at checkout to save 20% on eCourses and books (some exclusions apply)!

11182 Cathodic Protection Design Considerations for Buried Nuclear Piping

Product Number: 51300-11182-SG
ISBN: 11182 2011 CP
Author: Steven F. Daily
Publication Date: 2011
$0.00
$20.00
$20.00
Degradation of buried metallic piping is a significant issue facing owners and operators of nuclear power plants. The piping at nuclear plants consists of a network of different materials that are interconnected through the station ground to reduce the effects of hazardous voltages associated with lightning and fault currents in the earth. By connecting the metallic piping to the copper grounding grid, corrosion rates can increase on some of the buried piping resulting in loss of metal and reduction in wall thickness. When cathodic protection (CP) is applied at nuclear power plants to control corrosion of the buried piping, much of the current will tend to flow to other metallic structures that are not intended for CP. This will result in a significant increase in the current requirement for cathodic protection. The design of the CP systems is further complicated by the complex configuration of the piping networks, limited space and shielding effects from building foundations and other buried structures. This paper discusses the issues associated with the design and installation of CP systems for buried nuclear piping; taking into account the need for higher current requirements, uniform current distribution, anode bed configuration, test sites and criteria for effective cathodic protection.

Key words: cathodic protection, nuclear power plant, buried nuclear piping, current requirement, current distribution, shielding, dissimilar metal corrosion, coupon test stations, cathodic protection criteria, polarization, over protection.
Degradation of buried metallic piping is a significant issue facing owners and operators of nuclear power plants. The piping at nuclear plants consists of a network of different materials that are interconnected through the station ground to reduce the effects of hazardous voltages associated with lightning and fault currents in the earth. By connecting the metallic piping to the copper grounding grid, corrosion rates can increase on some of the buried piping resulting in loss of metal and reduction in wall thickness. When cathodic protection (CP) is applied at nuclear power plants to control corrosion of the buried piping, much of the current will tend to flow to other metallic structures that are not intended for CP. This will result in a significant increase in the current requirement for cathodic protection. The design of the CP systems is further complicated by the complex configuration of the piping networks, limited space and shielding effects from building foundations and other buried structures. This paper discusses the issues associated with the design and installation of CP systems for buried nuclear piping; taking into account the need for higher current requirements, uniform current distribution, anode bed configuration, test sites and criteria for effective cathodic protection.

Key words: cathodic protection, nuclear power plant, buried nuclear piping, current requirement, current distribution, shielding, dissimilar metal corrosion, coupon test stations, cathodic protection criteria, polarization, over protection.
Product tags
Also Purchased
Picture for 11184 Copper Grounding and Cathodic Protection In Nuclear Facilities
Available for download

11184 Copper Grounding and Cathodic Protection In Nuclear Facilities

Product Number: 51300-11184-SG
ISBN: 11184 2011 CP
Author: Earl L. Kirkpatrick
Publication Date: 2011
$20.00
Picture for US Nuclear Regulatory Commission Activities Regarding Buried and Underground Piping at Nuclear Power
Available for download

51315-5511-US Nuclear Regulatory Commission Activities Regarding Buried and Underground Piping at Nuclear Power

Product Number: 51315-5511-SG
ISBN: 5511 2015 CP
Author: David Alley
Publication Date: 2015
$20.00