The Greater Gabbard Offshore Wind Farm is the world's largest offshore wind farm project (500MW) to move into
the construction phase and will be built approximately 25 kilometers off the Suffolk coast of the United Kingdom
(UK). The construction work started in summer 2009 and features 140 wind turbines each having a rated capacity
of 3.6 MW. The turbines are mounted on steel monopiles and transition pieces in water depths between 24 and
34 meters.
The selection of the optimal cathodic protection system was based on extensive computer modeling. The
simulation campaign compared Impressed Current Cathodic Protection (ICCP), Sacrificial Anode Cathodic
Protection (SACP) as well as combined approaches against operating parameters taking into account calcareous
layer erosion, flow rate dependant polarisation behavior and layers with changing resistivity. In addition, the
dissolution effects of the sacrificial anodes and remaining lifetime of the MMO anode pastilles have been
simulated.
This presentation details the results of the comparison study of the various cathodic protection systems as well as
of the installed design.
Keywords: simulation software, of-shore, wind farm, ICCP, design validation