Search
Filters
Close

10116 Pre-Construction HVAC Interference Predictive Modeling, Mitigation Installation and Follow Up

Product Number: 51300-10116-SG
ISBN: 10116 2010 CP
Author: Philip D. Simon, PE, Gordon A. Jensen and John W. Bissell
Publication Date: 2010
$0.00
$20.00
$20.00
This paper presents data and analysis from a case history involving the mitigation of AC interference on multiple crude pipelines in a 130mile (210 km) long collocation with a new 345 kV High Voltage Alternating Current (HVAC) power transmission line. The configuration was significantly more complicated than the stated capacity of the predictive modeling software used. However, with some compromises, predictive modeling using the software provided useful results and allowed for the design of a successful mitigation system. Actual field data is compared to predicted AC interference levels and the mitigation system details and operating characteristics are presented.

Keywords: HVAC interference, buried pipeline, power transmission line, mitigation/shield wire, DC decoupler, predictive modeling, grounding
This paper presents data and analysis from a case history involving the mitigation of AC interference on multiple crude pipelines in a 130mile (210 km) long collocation with a new 345 kV High Voltage Alternating Current (HVAC) power transmission line. The configuration was significantly more complicated than the stated capacity of the predictive modeling software used. However, with some compromises, predictive modeling using the software provided useful results and allowed for the design of a successful mitigation system. Actual field data is compared to predicted AC interference levels and the mitigation system details and operating characteristics are presented.

Keywords: HVAC interference, buried pipeline, power transmission line, mitigation/shield wire, DC decoupler, predictive modeling, grounding
Product tags
Also Purchased
Picture for 01601 MITIGATION DESIGN, INSTALLATION AND POST
Available for download

01601 MITIGATION DESIGN, INSTALLATION AND POST COMMISSIONING MEASUREMENTS FOR A PIPELINE COLLOCATED WITH AC TRANSMISSION LINES

Product Number: 51300-01601-SG
ISBN: 01601 2001 CP
Author: John Dabkowski, Robert F. Allen, Frank A. Perry
$20.00
Picture for 03698 Estimating AC Mitigation Requirements
Available for download

03698 Estimating AC Mitigation Requirements for Pipelines Installed in High Voltage AC Corridors: Fault Conditions

Product Number: 51300-03698-SG
ISBN: 03698 2003 CP
Author: R. D. Southey, Eng. W. Ruan, F. P. Dawalibi, S. Fortin
$20.00