Corrosion induced cracking, delamination, and spalling of prestressed coastal bridge pilings presents a formidable challenge to maintenance and maintenance planning, both in Florida and elsewhere. Particularly needed is a protocol whereby engineers can prioritize corrosion damaged pilings according to deterioration severity and reduced load bearing capacity. In this project, ten pilings on six coastal bridges were inspected; and the dimensions of concrete cracks, delaminations, and spalls were measured. These then served as input to a Priority Ranking equation that was formulated to yield a quantitative number (PR) that is intended to reflect loss of piling load bearing capacity. The same inspection and analysis was also performed for ten pilings from the old St. George Island Bridge. Subsequent to an on-site inspection, the latter pilings were recovered and tested to failure as part of another project. The PR value for the 20 pilings was compared with load capacity analysis results determined using FB-MultiPier and the Florida Department of Transportation Biaxial Column Program software and, in the case of the St. George Island Bridge, experimental strength determinations.
Corrosion induced cracking, delamination, and spalling of prestressed coastal bridge pilings presents a formidable challenge to maintenance and maintenance planning, both in Florida and elsewhere. Particularly needed is a protocol whereby engineers can prioritize corrosion damaged pilings according to deterioration severity and reduced load bearing capacity. In this project, ten pilings on six coastal bridges were inspected; and the dimensions of concrete cracks, delaminations, and spalls were measured. These then served as input to a Priority Ranking equation that was formulated to yield a quantitative number (PR) that is intended to reflect loss of piling load bearing capacity. The same inspection and analysis was also performed for ten pilings from the old St. George Island Bridge. Subsequent to an on-site inspection, the latter pilings were recovered and tested to failure as part of another project. The PR value for the 20 pilings was compared with load capacity analysis results determined using FB-MultiPier and the Florida Department of Transportation Biaxial Column Program software and, in the case of the St. George Island Bridge, experimental strength determinations.
Product tags
Also Purchased
Picture for 07273 FIELD TRIAL OF IMPRESSED CURRENT, SACRIFICIAL ANODE, CONSTANT VOLTAGE, AND INTERMITTENT CATHOD
Available for download

07273 FIELD TRIAL OF IMPRESSED CURRENT, SACRIFICIAL ANODE, CONSTANT VOLTAGE, AND INTERMITTENT CATHODIC PROTECTION ON A STEEL REINFORCED COASTAL BRIDGE

Product Number: 51300-07273-SG
ISBN: 07273 2007 CP
Author: S. J. Bullard, B. S. Covino Jr., K. M. Williamson , G.R. Holcomb, M. Ziomek-Moroz, David A. Ede, C.
Publication Date: 2007
$20.00
Picture for 06357 THE CORROSION OF STEEL IN CRACKED CONCRETE
Available for download

06357 THE CORROSION OF STEEL IN CRACKED CONCRETE: EXPERIMENTAL INVESTIGATION USING EXTERNAL POLARIZATION

Product Number: 51300-06357-SG
ISBN: 06357 2006 CP
Author: Mingdong Bi, Kolluru Subramaniam
$20.00
Picture for 07306 LONG-TERM CORROSION BEHAVIOR OF EPOXY COATED REBAR IN FLORIDA
Available for download

07306 LONG-TERM CORROSION BEHAVIOR OF EPOXY COATED REBAR IN FLORIDA

Product Number: 51300-07306-SG
ISBN: 07306 2007 CP
Author: Kingsley Lau and Alberto A. Sagüés
Publication Date: 2007
$20.00