Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

03711 PREPARING GAS DISTRIBUTION PIPING FOR THE CONSTRUCTION OF A LIGHT RAIL TRANSIT SYSTEM

Product Number: 51300-03711-SG
ISBN: 03711 2003 CP
Author: Joel Beggs, John H. Fitzgerald III
$0.00
$20.00
$20.00
The light rail transit (LRT) system in Minneapolis, Minnesota is being constructed in response to the need to ease freeway congestion and move more people. To prepare the gas distribution piping for detection, monitoring and control of any stray current that might occur, the gas company has isolated the piping and installed various testing and measurement facilities. Stray current provisions include buried permanent reference electrodes in strategic locations, current measuring hoops on the piping to detect magnitude and direction of current, special piping construction for pipe crossing the tracks in the downtown area and judicious use of electrical isolating joints in various lines. Baseline surveys and future testing programs are being developed. This paper describes the LRT system and the preparations being made on the gas distribution piping. Keywords: programs current measuring hoops, gas distribution piping, light rail transit, stray current, testing
The light rail transit (LRT) system in Minneapolis, Minnesota is being constructed in response to the need to ease freeway congestion and move more people. To prepare the gas distribution piping for detection, monitoring and control of any stray current that might occur, the gas company has isolated the piping and installed various testing and measurement facilities. Stray current provisions include buried permanent reference electrodes in strategic locations, current measuring hoops on the piping to detect magnitude and direction of current, special piping construction for pipe crossing the tracks in the downtown area and judicious use of electrical isolating joints in various lines. Baseline surveys and future testing programs are being developed. This paper describes the LRT system and the preparations being made on the gas distribution piping. Keywords: programs current measuring hoops, gas distribution piping, light rail transit, stray current, testing
PRICE BREAKS - The more you buy, the more you save
Quantity
1+
5+
Price
$20.00
$20.00
Product tags
Also Purchased
Picture for 05248 Stray Current Testing on a Gas Distribution
Available for download

05248 Stray Current Testing on a Gas Distribution Piping Following Start-up of a New Light Rail Transit Line

Product Number: 51300-05248-SG
ISBN: 05248 2005 CP
Author: John H. Fitzgerald, III, Consultant; Joel Beggs, Centerpoint Energy Minnegasco
$20.00
Picture for 11339 Lessons Learned During the Startup of the Phoenix Valley Light Rail System
Available for download

11339 Lessons Learned During the Startup of the Phoenix Valley Light Rail System

Product Number: 51300-11339-SG
ISBN: 2011 11339 CP
Author: Philip Simon and Preston Ford
Publication Date: 11339
$20.00
Picture for 08063 Light Rail Transit Stray Current Control: How Much Water Line Protection is Really Needed?
Available for download

08063 Light Rail Transit Stray Current Control: How Much Water Line Protection is Really Needed?

Product Number: 51300-08063-SG
ISBN: 08063 2008 CP
Author: Dale Lindemuth and David H. Kroon
Publication Date: 2008
$20.00