Search
Filters
Close

Celebrate World Corrosion Awareness Day with 20% off eCourses and eBooks with code WCAD2024 at checkout!

51312-01231-Use of ECDA Approach in Prioritization of ILI Anomalies

Product Number: 51312-01231-SG
ISBN: 01231 2012 CP
Author: Sorin M. Segall
Publication Date: 2012
$0.00
$20.00
$20.00
ABSTRACT An effective ILI program shall provide a prioritized excavation response plan to address anomalies identified as being of particular concern. Locations that show potential for imminent or short term failure are prioritized under Phase 1 and Phase 2 responses respectively while anomalies that could grow to become a severe risk for pipeline integrity prior to the next ILI are prioritized as Phase 3 excavations. This paper describes the use of ECDA principles in prioritizing Phase 3 anomalies on a gas pipeline in northern Ontario resulting in a more effective excavation program. An ECDA type of prioritization criterion based on the results of an integrated CIPS/DCVG survey in conjunction with the results of Phase 1 and Phase 2 digs is proposed. Keywords: ILI ECDA CIPS DCVG Prior History of Corrosion.
ABSTRACT An effective ILI program shall provide a prioritized excavation response plan to address anomalies identified as being of particular concern. Locations that show potential for imminent or short term failure are prioritized under Phase 1 and Phase 2 responses respectively while anomalies that could grow to become a severe risk for pipeline integrity prior to the next ILI are prioritized as Phase 3 excavations. This paper describes the use of ECDA principles in prioritizing Phase 3 anomalies on a gas pipeline in northern Ontario resulting in a more effective excavation program. An ECDA type of prioritization criterion based on the results of an integrated CIPS/DCVG survey in conjunction with the results of Phase 1 and Phase 2 digs is proposed. Keywords: ILI ECDA CIPS DCVG Prior History of Corrosion.
Product tags
Also Purchased
Picture for Challenges in Analyzing ECDA Indirect Inspections Data
Available for download

51314-3815-Challenges in Analyzing ECDA Indirect Inspections Data

Product Number: 51314-3815-SG
ISBN: 3815 2014 CP
Author: Sorin Segall
Publication Date: 2014
$0.00