Search
Filters
Close

97577 COATING APPLICATION AND EVALUATION FOR HEAVY WALL THICKNESS, TEMPERATURE AND PRESSURE PIPELINE

Product Number: 51300-97577-SG
ISBN: 97577 1997 CP
Author: Valmore Rodriguez, Elias Perozo, Elena Alvarez
$0.00
$20.00
$20.00
A Venezuelan oil company is developing a project for high pressure gas injection for oil recovery. This project has a compression plant to increase the gas pressure from 1200 to 9000 psi. Due to the high gas pressure (9000 psi) and high temperature (90°C), a carbon steel API 5L-X60 with 2.5 in thickness pipe has been selected. The gas is transported from the compression plant to the injection well. This type of pipeline is unique in the world and in our knowledge no one has applied and evaluated external coating for this combination of heavy wall thickness, pressure and temperature pipeline Dual fusion bonded epoxy was selected as main coating, combined with high temperature sleeves for the joints. Several parameters were considered in the selection of the coating high temperature, wall thickness, application condition, heat during the welding process and coating performance in the lab. The large amount of heat accumulated during the application, due to the thick wall, requires a modification of coating application parameters, as well as the cooling condition. The evaluation of the coating was performed with a specially designed test for high temperatures. The laboratory results (impact resistance, degree of curing, cathodic disbanding, adhesion and hot water immersion) indicate that the application condition used was good to obtain a product under specification. Kevwords: coating, corrosion, protection, FBE, heavy wall thickness, pipeline, high temperature, sleeve.
A Venezuelan oil company is developing a project for high pressure gas injection for oil recovery. This project has a compression plant to increase the gas pressure from 1200 to 9000 psi. Due to the high gas pressure (9000 psi) and high temperature (90°C), a carbon steel API 5L-X60 with 2.5 in thickness pipe has been selected. The gas is transported from the compression plant to the injection well. This type of pipeline is unique in the world and in our knowledge no one has applied and evaluated external coating for this combination of heavy wall thickness, pressure and temperature pipeline Dual fusion bonded epoxy was selected as main coating, combined with high temperature sleeves for the joints. Several parameters were considered in the selection of the coating high temperature, wall thickness, application condition, heat during the welding process and coating performance in the lab. The large amount of heat accumulated during the application, due to the thick wall, requires a modification of coating application parameters, as well as the cooling condition. The evaluation of the coating was performed with a specially designed test for high temperatures. The laboratory results (impact resistance, degree of curing, cathodic disbanding, adhesion and hot water immersion) indicate that the application condition used was good to obtain a product under specification. Kevwords: coating, corrosion, protection, FBE, heavy wall thickness, pipeline, high temperature, sleeve.
PRICE BREAKS - The more you buy, the more you save
Quantity
1+
5+
Price
$20.00
$20.00
Product tags
Also Purchased
Picture for 06047 Protective Pipeline Coating Evaluation
Available for download

06047 Protective Pipeline Coating Evaluation

Product Number: 51300-06047-SG
ISBN: 06047 2006 CP
Author: Sankara Papavinasam, R.Winston Revie
$20.00
Picture for 96561 ASSESSMENT OF COATING QUALITY IN
Available for download

96561 ASSESSMENT OF COATING QUALITY IN CP/COATING SYSTEMS

Product Number: 51300-96561-SG
ISBN: 96561 1996 CP
Author: Unni Steinsmo, John M. Drugli
$20.00
Picture for 00009 REPORT OF A COATING FAILURE ON A 16-INCH
Available for download

00009 REPORT OF A COATING FAILURE ON A 16-INCH OIL PIPELINE UNDER WET CO2 SERVICE

Product Number: 51300-00009-SG
ISBN: 00009 2000 CP
Author: Klaus E. Kueter and David E. Hendrix
$20.00