11064 Completion Tubing Optimisation Meeting the Challenge Through Prediction and Operational Experience

Product Number: 51300-11064-SG
ISBN: 11064 2011 CP
Author: Bijan Kermani, Yves Gunaltun, Theo Samosir, Made-Emmy Pramitedewi and Cornelia Situmorang
Publication Date: 2011
$0.00
$20.00
$20.00
During the recent economical growth period the lead time of stainless steel tubular reached in excess of a year. This was considered inadequate particularly for the completion of wells in some marginal reservoirs with short expected production capacities and life times. A systematic and comprehensive study was therefore, undertaken to select and optimize suitable materials for the completion of lower part of a number of gas producing wells. Key challenges included economy and appropriateness to allow a fitness for service choice of tubing material. The study covered two parallel elements including (i) corrosivity assessment and (ii) placement of downhole coupons and tubing string in the cemented part of the wells. This aided materials optimization by developing application domain diagrams (ADDs) for candidate materials including carbon steel (C-steel) and low carbon 3%Cr steels. Operational experience was captured through analysis of downhole corrosion coupons after six months of exposure to evaluate the in-situ system corrosivity. In addition, a limited number of wells were completed with 3 % Cr and carbon steel. After one year of production they were inspected by caliper runs showing encouraging results which led to additional wells being completed with C-steel. This paper summarizes the outcome of different studies and inspection and demonstrates the significance of correct materials selection approach and implementation of corrosion management strategy in meeting economy and appropriateness to enable fitness for service.

Key words: Corrosion prediction, CO2 corrosion, modeling, material selection, tubing corrosion
During the recent economical growth period the lead time of stainless steel tubular reached in excess of a year. This was considered inadequate particularly for the completion of wells in some marginal reservoirs with short expected production capacities and life times. A systematic and comprehensive study was therefore, undertaken to select and optimize suitable materials for the completion of lower part of a number of gas producing wells. Key challenges included economy and appropriateness to allow a fitness for service choice of tubing material. The study covered two parallel elements including (i) corrosivity assessment and (ii) placement of downhole coupons and tubing string in the cemented part of the wells. This aided materials optimization by developing application domain diagrams (ADDs) for candidate materials including carbon steel (C-steel) and low carbon 3%Cr steels. Operational experience was captured through analysis of downhole corrosion coupons after six months of exposure to evaluate the in-situ system corrosivity. In addition, a limited number of wells were completed with 3 % Cr and carbon steel. After one year of production they were inspected by caliper runs showing encouraging results which led to additional wells being completed with C-steel. This paper summarizes the outcome of different studies and inspection and demonstrates the significance of correct materials selection approach and implementation of corrosion management strategy in meeting economy and appropriateness to enable fitness for service.

Key words: Corrosion prediction, CO2 corrosion, modeling, material selection, tubing corrosion
Product tags
Also Purchased
Picture for 06121 MATERIALS DESIGN STRATEGY:
Available for download

06121 MATERIALS DESIGN STRATEGY: EFFECTS OF H2S/CO2 CORROSION ON MATERIALS SELECTION

Product Number: 51300-06121-SG
ISBN: 06121 2006 CP
Author: Bijan Kermani, John Martin, Khlefa Esaklul
$20.00
Picture for 11061 Inhibitive Properties of Crude Oils:  Can We Count on Them?
Available for download

11061 Inhibitive Properties of Crude Oils: Can We Count on Them?

Product Number: 51300-11061-SG
ISBN: 11061 2011 CP
Author: Mioara Stroe, Nicolas Passade Boupat, Michel Bonis and Benjamin Adams
Publication Date: 2011
$20.00
Picture for 11069 Predicting Iron Production From Sweet Gas-Condensate Pipelines
Available for download

11069 Predicting Iron Production From Sweet Gas-Condensate Pipelines

Product Number: 51300-11069-SG
ISBN: 11069 2011 CP
Author: Michel R. Bonis and Per Tobiassen
Publication Date: 2011
$20.00