10040 Risk-Based Inspection for Polymers

Product Number: 51300-10040-SG
ISBN: 10040 2010 CP
Author: Eileen Chant, Ph.D., P.E. and J. Robert Sims
Publication Date: 2010
$0.00
$20.00
$20.00
A Risk-Based Inspection (RBI) work process has been developed for above-ground, fiberglass reinforced polymer (FRP) storage tanks containing one of five designated chemicals. The process complies with American Petroleum Institute’s Recommended Practice 580 – Risk-Based Inspection and the ASME PCC-3 Inspection Planning using Risk-Based methods that were developed for fixed equipment and piping in the hydrocarbon and chemical process industries. However the basic methodology can be adapted to any class of industrial equipment, such as FRP equipment. Damage mechanism documentation for five selected chemical and tank construction combinations was developed to provide guidance in developing failure scenarios.

The RBI work process includes a benefit-cost analysis that compares the economic benefit of mitigation to the cost of the actions selected to mitigate the risk. Mitigation of the S/H/E risk is also an inherent part of developing the inspection and maintenance plan. This RBI work process allows plant personnel to monitor reliability while delivering a task-focused, cost effective inspection and maintenance plan for a FRP storage tank.

Keywords: Risk-Based Inspection, FRP, Polymers, Corrosion
A Risk-Based Inspection (RBI) work process has been developed for above-ground, fiberglass reinforced polymer (FRP) storage tanks containing one of five designated chemicals. The process complies with American Petroleum Institute’s Recommended Practice 580 – Risk-Based Inspection and the ASME PCC-3 Inspection Planning using Risk-Based methods that were developed for fixed equipment and piping in the hydrocarbon and chemical process industries. However the basic methodology can be adapted to any class of industrial equipment, such as FRP equipment. Damage mechanism documentation for five selected chemical and tank construction combinations was developed to provide guidance in developing failure scenarios.

The RBI work process includes a benefit-cost analysis that compares the economic benefit of mitigation to the cost of the actions selected to mitigate the risk. Mitigation of the S/H/E risk is also an inherent part of developing the inspection and maintenance plan. This RBI work process allows plant personnel to monitor reliability while delivering a task-focused, cost effective inspection and maintenance plan for a FRP storage tank.

Keywords: Risk-Based Inspection, FRP, Polymers, Corrosion
Product tags
Also Purchased
Picture for 99009 CORROSION RISK ASSESSMENT AND RISK
Available for download

99009 CORROSION RISK ASSESSMENT AND RISK BASED INSPECTION FOR SWEET OIL AND GAS CORROSION - PRACTICAL EXPERIENCE

Product Number: 51300-99009-SG
ISBN: 99009 1999 CP
Author: M. J. Pursell, C. Selman and M. F. Nielsen
$20.00
Picture for 99388 RISK BASED INSPECTION DEMONSTRATING
Available for download

99388 RISK BASED INSPECTION DEMONSTRATING VALUE

Product Number: 51300-99388-SG
ISBN: 99388 1999 CP
Author: Greg Alvarado, Lynne Kaley and Ricardo R. Valbuena
$20.00
Picture for 03638 RISK BASED INSPECTION AS PART OF AN OVERALL
Available for download

03638 RISK BASED INSPECTION AS PART OF AN OVERALL INSPECTION MANAGEMENT PROGRAM

Product Number: 51300-03638-SG
ISBN: 03638 2003 CP
Author: Rick Peterson, Robert Jablonski
$20.00